ASTRO Renewables - Example Installations

  • Writer: Sam Boutorabi
    Sam Boutorabi
  • Sep 5
  • 4 min read

Some of our recent systems in action, showcasing the quality and detail behind every project we complete.


Commercial Solar Project 1 - 674.96kWp

The successful completion of a 674.96 kWp commercial solar installation. ASTRO Renewables Ltd acted as the Sub-EPC, managing the full project execution and ensuring seamless delivery on time and within budget.



This PPA project required no upfront cost for the client while delivering an estimated 574,555 kWh/year, significantly reducing CO₂ emissions by 118,923 kg annually.


Project Highlights:

  • Outstanding Efficiency: 96.3% Self-Consumption of Solar Generated & 85.61% System Performance Ratio

  • Optimised Design: 1,534 JA 440W Modules & 480kW of Solis Inverters

  • Seamless Execution: 4 weeks for solar roof installation, 2 weeks for AC and point of connection installation

  • Minimal Impact – Maximum Results: Proactive project management & real-time client communication

  • Built for Safety & Longevity: Permanent skylight protection & fall arrest system for long-term O&M excellence

  • Ongoing Support: Free Operation & Maintenance to ensure long-term performance


Commercial Solar Project 2 - 140.37kWp

We are thrilled to announce the successful delivery of a solar PV system for a school in Bristol, marking another step in ASTRO Renewables Ltd’s mission to help educational institutions embrace renewable energy.



Location: Bristol

System Size: 140.37kWp across three rooftops

Scope: A mix of flat roof and standing seam installations


Key Details:

  • 350 Q-Cell Modules Installed: 74 @405Wp and 276 @400Wp

  • Solis Inverters: 100kW in Total (2 x 25kW + 1 x 50kW)

  • Estimated Solar Generation: 126,515kWh/year

  • CO₂ Emissions Avoided: 59,441 kg/year

  • Self-Consumption Rate: 77.49%

  • Delivered in just 10 days!


Commercial Solar Project 3 - 106.8kWp

We’re excited to share the successful delivery of our latest commercial solar project, designed for optimal efficiency and environmental impact, achieving an impressive 97% self-consumption rate.



Project Highlights:

  • System Size: 106.8kWp

  • Installation Time: 9 days

  • Modules: 240 x 445W JA Modules (JAM54D40-445/LB)

  • Inverter: Huawei 100kW (SUN2000-100KTL-M2)

  • Annual Energy Production: 87,800 kWh

  • Self-Consumption: 97% of solar energy generated

  • Self-Sufficiency: 4.3% of total energy demand

  • Performance Ratio: 88.39%

  • CO₂ Emissions Avoided: 18,171 kg/year


Commercial Solar Project 4 - 87.37kWp

We are thrilled to announce the completion of another commercial solar project, achieving an impressive 41% reduction in our client's annual energy costs.



Project Overview:

  • System Size: 87.37kWp

  • Completion Time: 7 days

  • Solar Modules: 173 x 505W JA Modules (JAM66S30-505/MR)

  • Inverter: Solis 60kW (S5-GC60K)

    • Built-in Surge Protection

    • Inverter-Level Monitoring

  • Estimated Annual Energy Production: 86,961 kWh

  • Self-Consumption: 71.9% of generated solar energy

  • Self-Sufficiency: Solar covers 41% of the client’s total demand

  • System Performance Ratio: 84.72%

  • CO2 Emissions Avoided: 16,868 kg/year


Commercial Solar Project 5 - 99.88kWp

🌞 99.88kWp Commercial Solar Installation in 5 Days! 🌞




 Project Overview:

  • System Size: 99.88kWp 

  • PV Energy Generated: 82,282 kWh/Year

  • JA Solar Modules: 227 x 440Wp (JAM54D41-440/GB)

  • Inverters: 1 x Solis 80kW (80K-5G-PRO)

  • Monitoring: Inverter level monitoring (Built-in Simcard)

  • Delivery Time: Completed in 5 Days from Start to Handover

  • Environmental Impact: 16,784 kg/year of CO2 emissions avoided


Commercial Solar Project 6 - 147.84kWp

We're excited to share the completion of our latest commercial solar installation at a site in Selby.



Project Highlights:

  • System Size: 147.84kWp

·        Modules: 336 x 440Wp JA Modules (JAM54D40-440/LB)

·        Optimizers: 168 x SolarEdge S1000 Optimizers

·        Inverter: 1 x SolarEdge 100kW Synergy Manager

·        Built-in Surge protection

·        Firefighter Emergency Gateway System

·        Inverter Level Monitoring (Built-in GSM)

  • Estimated Annual Energy Production: [118,640 kWh/year]

  • Environmental Impact: This installation will reduce carbon emissions by 22.94 tonnes/year], equivalent to planting 1,054 trees!


Safety First: This installation is equipped with a Firefighter Gateway Emergency System, ensuring the highest level of safety. The system includes:


  • Manual & Automatic DC Shutdown: Enhances safety by allowing immediate deactivation of the system in case of emergency.

  • Real-time DC Voltage Monitoring: Provides a continuous real-time indication of system voltage for safety assurance.

  • Emergency Stop Button: Allows complete shutdown of the PV system at the touch of a button.


Commercial Solar Project 7 - 189.88kWp

We're proud to integrate this advanced safety technology, ensuring not only sustainability but also the safety of the site and its occupants.



Specification: 

  • System Size: 189.88kWp

  • 376 x 505Wp JA Modules (JAM66S30-505/MR)

  • 190 x SolarEdge S1200 Optimizers

  • 2 x SolarEdge 66.6kW Synergy Managers

  • DC and AC Surge protection

  • Consumption Level Monitoring

  • Delivery time: 2 Weeks

  • CO2 Emissions Avoided: 33,342 kg/year


This project is a significant milestone for ASTRO Renewables Ltd as we successfully completed our SolarEdge Expert training, demonstrating our commitment to delivering high-quality, sustainable energy solutions.


Commercial Solar Project 8 - 62.62kWp

This project holds special significance as it was installed on the rooftop of the factory that produces graduation gowns for universities—including the very one our Director rented for his MSc graduation 12 years ago! It’s interesting how life comes full circle, with the same factory now playing a part in our journey towards a sustainable future.



Project Overview:

  • System Size: 62.62kWp

  • JA Solar Modules: 124 x 505Wp (JAM66S30-505/MR)

  • Inverters: 1 x Solis 50kW (S5-GC50K)

  • Monitoring: Inverter level monitoring

  • Delivery Time: Completed in 5 Days from Start to Handover

  • Environmental Impact: 11,608 kg/year of CO2 emissions avoided


Commercial Solar Project 9 - 67.67kWp

 


 Commercial Solar Project Overview:

  •  System Size: 67.67kWp

  •  JA Solar Modules: 134 x 505Wp (JAM66S30-505/MR)

  •  Inverters: 1 x Solis 50kW (S5-GC50K)

  •  Monitoring: Inverter level monitoring

  •  Delivery Time: Completed in 5 Days from Start to Handover

  •  Environmental Impact: 12,791 kg/year of CO2 emissions avoided


At ASTRO Renewables, we specialise in end-to-end project management, ensuring efficient, proactive, and professional delivery. With a proven track record of completing projects ahead of schedule, within budget, and to the highest quality standards, we continue to set the benchmark for excellence in the solar industry.



 
 
 

Tel: 0345 548 0200

Address: 4th Floor, Silverstream House

45 Fitzroy Street, Fitzrovia, London, W1T 6EB

Follow Us on LinkedIn

  • LinkedIn
Astro Renewables Logo

© 2024 by Astro Renewables. 

Registered in England and Wales. (15473994).

Registered office: 4h Floor, Silverstream House,

45 Fitzroy Street, Fitzrovia, London, W1T 6EB.

bottom of page