ASTRO Renewables - Example Installations
- Sam Boutorabi
- Sep 5
- 4 min read
Some of our recent systems in action, showcasing the quality and detail behind every project we complete.
Commercial Solar Project 1 - 674.96kWp
The successful completion of a 674.96 kWp commercial solar installation. ASTRO Renewables Ltd acted as the Sub-EPC, managing the full project execution and ensuring seamless delivery on time and within budget.
This PPA project required no upfront cost for the client while delivering an estimated 574,555 kWh/year, significantly reducing CO₂ emissions by 118,923 kg annually.
Project Highlights:
Outstanding Efficiency: 96.3% Self-Consumption of Solar Generated & 85.61% System Performance Ratio
Optimised Design: 1,534 JA 440W Modules & 480kW of Solis Inverters
Seamless Execution: 4 weeks for solar roof installation, 2 weeks for AC and point of connection installation
Minimal Impact – Maximum Results: Proactive project management & real-time client communication
Built for Safety & Longevity: Permanent skylight protection & fall arrest system for long-term O&M excellence
Ongoing Support: Free Operation & Maintenance to ensure long-term performance
Commercial Solar Project 2 - 140.37kWp
We are thrilled to announce the successful delivery of a solar PV system for a school in Bristol, marking another step in ASTRO Renewables Ltd’s mission to help educational institutions embrace renewable energy.
Location: Bristol
System Size: 140.37kWp across three rooftops
Scope: A mix of flat roof and standing seam installations
Key Details:
350 Q-Cell Modules Installed: 74 @405Wp and 276 @400Wp
Solis Inverters: 100kW in Total (2 x 25kW + 1 x 50kW)
Estimated Solar Generation: 126,515kWh/year
CO₂ Emissions Avoided: 59,441 kg/year
Self-Consumption Rate: 77.49%
Delivered in just 10 days!
Commercial Solar Project 3 - 106.8kWp
We’re excited to share the successful delivery of our latest commercial solar project, designed for optimal efficiency and environmental impact, achieving an impressive 97% self-consumption rate.
Project Highlights:
System Size: 106.8kWp
Installation Time: 9 days
Modules: 240 x 445W JA Modules (JAM54D40-445/LB)
Inverter: Huawei 100kW (SUN2000-100KTL-M2)
Annual Energy Production: 87,800 kWh
Self-Consumption: 97% of solar energy generated
Self-Sufficiency: 4.3% of total energy demand
Performance Ratio: 88.39%
CO₂ Emissions Avoided: 18,171 kg/year
Commercial Solar Project 4 - 87.37kWp
We are thrilled to announce the completion of another commercial solar project, achieving an impressive 41% reduction in our client's annual energy costs.
Project Overview:
System Size: 87.37kWp
Completion Time: 7 days
Solar Modules: 173 x 505W JA Modules (JAM66S30-505/MR)
Inverter: Solis 60kW (S5-GC60K)
Built-in Surge Protection
Inverter-Level Monitoring
Estimated Annual Energy Production: 86,961 kWh
Self-Consumption: 71.9% of generated solar energy
Self-Sufficiency: Solar covers 41% of the client’s total demand
System Performance Ratio: 84.72%
CO2 Emissions Avoided: 16,868 kg/year
Commercial Solar Project 5 - 99.88kWp
🌞 99.88kWp Commercial Solar Installation in 5 Days! 🌞
Project Overview:
System Size: 99.88kWp
PV Energy Generated: 82,282 kWh/Year
JA Solar Modules: 227 x 440Wp (JAM54D41-440/GB)
Inverters: 1 x Solis 80kW (80K-5G-PRO)
Monitoring: Inverter level monitoring (Built-in Simcard)
Delivery Time: Completed in 5 Days from Start to Handover
Environmental Impact: 16,784 kg/year of CO2 emissions avoided
Commercial Solar Project 6 - 147.84kWp
We're excited to share the completion of our latest commercial solar installation at a site in Selby.
Project Highlights:
System Size: 147.84kWp
· Modules: 336 x 440Wp JA Modules (JAM54D40-440/LB)
· Optimizers: 168 x SolarEdge S1000 Optimizers
· Inverter: 1 x SolarEdge 100kW Synergy Manager
· Built-in Surge protection
· Firefighter Emergency Gateway System
· Inverter Level Monitoring (Built-in GSM)
Estimated Annual Energy Production: [118,640 kWh/year]
Environmental Impact: This installation will reduce carbon emissions by 22.94 tonnes/year], equivalent to planting 1,054 trees!
Safety First: This installation is equipped with a Firefighter Gateway Emergency System, ensuring the highest level of safety. The system includes:
Manual & Automatic DC Shutdown: Enhances safety by allowing immediate deactivation of the system in case of emergency.
Real-time DC Voltage Monitoring: Provides a continuous real-time indication of system voltage for safety assurance.
Emergency Stop Button: Allows complete shutdown of the PV system at the touch of a button.
Commercial Solar Project 7 - 189.88kWp
We're proud to integrate this advanced safety technology, ensuring not only sustainability but also the safety of the site and its occupants.
Specification:
System Size: 189.88kWp
376 x 505Wp JA Modules (JAM66S30-505/MR)
190 x SolarEdge S1200 Optimizers
2 x SolarEdge 66.6kW Synergy Managers
DC and AC Surge protection
Consumption Level Monitoring
Delivery time: 2 Weeks
CO2 Emissions Avoided: 33,342 kg/year
This project is a significant milestone for ASTRO Renewables Ltd as we successfully completed our SolarEdge Expert training, demonstrating our commitment to delivering high-quality, sustainable energy solutions.
Commercial Solar Project 8 - 62.62kWp
This project holds special significance as it was installed on the rooftop of the factory that produces graduation gowns for universities—including the very one our Director rented for his MSc graduation 12 years ago! It’s interesting how life comes full circle, with the same factory now playing a part in our journey towards a sustainable future.
Project Overview:
System Size: 62.62kWp
JA Solar Modules: 124 x 505Wp (JAM66S30-505/MR)
Inverters: 1 x Solis 50kW (S5-GC50K)
Monitoring: Inverter level monitoring
Delivery Time: Completed in 5 Days from Start to Handover
Environmental Impact: 11,608 kg/year of CO2 emissions avoided
Commercial Solar Project 9 - 67.67kWp
Commercial Solar Project Overview:
System Size: 67.67kWp
JA Solar Modules: 134 x 505Wp (JAM66S30-505/MR)
Inverters: 1 x Solis 50kW (S5-GC50K)
Monitoring: Inverter level monitoring
Delivery Time: Completed in 5 Days from Start to Handover
Environmental Impact: 12,791 kg/year of CO2 emissions avoided
At ASTRO Renewables, we specialise in end-to-end project management, ensuring efficient, proactive, and professional delivery. With a proven track record of completing projects ahead of schedule, within budget, and to the highest quality standards, we continue to set the benchmark for excellence in the solar industry.